skip to content

Drilling Reports

88 Energy completes Icewine#2 first stage stimulation

19 June 2017 08:20

88 Energy has successfully completed stage 1 stimulation operations at Icewine#2 on the project onshore North Slope of Alaska.

88 Energy said the first stage (lower HRZ) of the planned two stage artificial stimulation of the HRZ shale was completed successfully at the weekend, as per the plan.

And it said preparations for the execution of the second stage (upper HRZ) were nearing completion and the job was expected to be completed over the next 12 hours. 88 Energy said: "Flowback is then planned from the upper zone until a representative sample can be obtained.

"The lower zone will then be comingled with the upper zone and additional samples acquired.

"Subsequent to the sample acquisition, the choke will then be gradually opened up to ascertain the maximum potential flow rate from both zones over the coming weeks.

"Sample analysis will take place in a lab over the next four to six weeks to allow for detailed characterisation of the hydrocarbon composition and phase in the reservoir."

At 8:20am: (LON:88E) 88 Energy Ltd share price was -0.15p at 3.9p

Story provided by StockMarketWire.com

Related Company: 88E

Info Point:

To buy or sell shares call our Dealing Room on 0113 243 6941.

Too much jargon? Our glossary will help make sense of things.

Find out more about our Share Dealing Services.

Client Area Access

» Secure Login

» Not registered yet?

-

Branch Finder

Redmayne-Bentley have High Street branches throughout the UK. Find your nearest branch.